Wednesday, 6 November 2024

CE Practice MSTC Problem 3 (Construction Methods)

Find the expected production in loose cubic meter (LCM) per hour of a 2.3 m3 hydraulic shovel equipped with a front dump bucket. The material is common earth with a bucket fill factor; of 1.0 .The average angle of swing is 75 degrees, and job efficiency is 0.80

No comments:

Post a Comment